History

Home / History

The Belvedere on the Potomac

A River Estate Shaped by Time – by Gary House, Belvedere owner 2021 to present

History at a Glance

The Belvedere on the Potomac stands on land shaped by nearly three centuries of water, work, conflict, and continuity.

  • Colonial era: The land formed part of the vast Northern Neck holdings of Lord Thomas Fairfax under British Crown grant. During the mid-18th century, Fairfax employed George Washington as a young land surveyor whose work helped define the legal and geographic framework of settlement throughout the Potomac Valley.
  • Late 1700s–early 1800s: Through successive private conveyances, the property passed into the hands of the Colston family, who established long-term ownership along this bend of the Potomac and developed mills, river dwellings, and working lands tied directly to water power.
  • 1830s: Construction of Dam No. 5 and the Chesapeake & Ohio Canal formalized the site’s regional importance, binding river, industry, and community together as part of a vital transportation and energy corridor.
  • 1861–1862: During the Civil War, General Thomas J. “Stonewall” Jackson repeatedly targeted Dam No. 5 in an effort to disrupt Union coal and supply lines—bringing sustained military action directly to the land below the house.
  • Post-Civil War (1871): Financial strain following the war led to the court-ordered sale of the Colston river properties, ending nearly a century of family ownership and marking the site’s transition toward industrial stewardship.
  • Late 19th century: The former Honeywood Mill site was redeveloped as a wood-pulp mill operated by the Susquehanna Paper Company, powered by Dam No. 5 and supervised by J. West, reflecting the river’s continued industrial importance even as canal commerce declined.
  • Early 20th century: Hydroelectric generating equipment was installed at Dam No. 5, extending the site’s working life from milling and transport into modern power generation.
  • 20th century to present: Through private ownership, preservation, and careful stewardship, the property evolved from an industrial river site into a place of gathering, reflection, and celebration.

The Land and the River

A Place Shaped by Water

Long before it carried a name, the property now known as The Belvedere existed because of the Potomac River.

Before private settlement, this land formed part of the vast proprietary holdings of Lord Thomas Fairfax, the Sixth Lord Fairfax of Cameron, who controlled more than five million acres of Northern Neck Virginia under grant from the British Crown. Fairfax’s ownership shaped the earliest legal and geographic framework of the region, as land was surveyed, patented, and conveyed to settlers who would transform wilderness into working farms, mills, and river communities.

By the late eighteenth century, portions of this land had passed into the hands of Rawleigh Colston, who acquired significant holdings along the Potomac as part of the broader Colston family estate. This acquisition placed the Colstons among the principal landholders at the river’s edge just as the region transitioned from frontier settlement into the early American republic.

By the early nineteenth century, stewardship of the riverfront holdings passed from Rawleigh Colston and his wife Elizabeth Marshall Colston to their son Edward Colston and his wife Sarah Jane Brockenbrough Colston. As Rawleigh and Elizabeth aged, Edward and Sarah Jane became the active owners and operators of the mill sites, river dwellings, and associated lands along Dam No. 5, managing the working landscape that tied milling, water power, and residence together at this bend of the Potomac.

When the C&O Canal Company constructed Dam No. 5 between 1833 and 1834, the dam did not create the importance of this site — it formalized it.

The dam fed the canal. The canal fed commerce. And commerce fed the homes and mills along its banks.

Lord Thomas Fairfax
Lord Thomas Fairfax

Dam No. 5 — Construction, Repair, and Evolution

  • 1832–1834: Original dam constructed using a timber crib filled with rubble stone, a common but flood‑vulnerable technique of the era.
  • 1830s–1850s: Repeated high‑water events required ongoing maintenance and emergency repairs.
  • 1857: Severe flooding caused extensive damage to the timber structure, washing out significant portions of the dam.
  • Late 1850s: Plans initiated to replace the damaged crib dam with a more durable stone masonry dam.
  • Civil War Period (1861–1862): Repair and reconstruction efforts disrupted by repeated Confederate attacks during Stonewall Jackson’s operations against the canal.
  • Post‑war, c. 1860s–1870: Completion of the stone masonry dam, creating a far more permanent structure capable of withstanding floods and industrial use.
  • Early 20th Century: Portions of Dam No. 5 adapted for hydroelectric power generation, extending its usefulness beyond canal commerce.
Dam 5 Sign

This pattern—construction, destruction, adaptation, and reuse—mirrors the broader history of the river and the property overlooking it.

Sidebar — Why Dam No. 5 Mattered

Dam No. 5 was not an isolated structure, but part of a carefully engineered system of seven Potomac River dams designed to make the Chesapeake & Ohio Canal viable through difficult terrain. At this point along the river, steep banks, rocky ledges, and seasonal fluctuations made a conventional canal prism impractical.

Instead, canal engineers created a slackwater pool behind Dam No. 5, allowing canal boats to navigate directly on the river for a short distance before re‑entering the canal through This design reduced construction costs, conserved water, and minimized the number of lift locks required.

The dam’s location made it indispensable. When Dam No. 5 functioned, the canal functioned. When it failed, navigation—and coal supply to Washington—was immediately threatened.

canal boat1

Dam No. 5 — Construction Facts (The Original Dam)

  • August 25, 1832: Contract awarded to Byrnes and Co.
  • March 1833: Work commenced on the dam.
  • December 1834: Work completed.
  • Total Cost: $47,088.67

A view of Dam #5 in 2022

Labor, Conflict, and the Human Cost of the Canal

Irish Laborers at Dam No. 5

The construction of Dam No. 5 and the Chesapeake & Ohio Canal was not only an engineering undertaking, but a human one—carried out largely by Irish immigrant laborers newly arrived in America.

During the canal‑building era of the 1830s, rival Irish work gangs known as the Corkonians (men from County Cork) and the Fardowners or Longfords (from central Ireland, particularly County Longford) competed fiercely for employment along major infrastructure projects. These rivalries were not new; many of the men had been on opposing sides of local conflicts in Ireland before emigrating, and those tensions followed them across the Atlantic.

Near Dam No. 5, competition for canal jobs escalated into violent confrontation. Contemporary accounts describe large groups of laborers facing off near the dam site, fighting not over ideology or allegiance, but over access to work and survival. The conflict at Dam No. 5 became part of a broader pattern of Irish‑on‑Irish labor violence seen on canals and railroads throughout the young United States.

Long before soldiers arrived during the Civil War, this stretch of the Potomac had already witnessed struggle—driven by poverty, displacement, and the brutal realities of early American industrial expansion.

The "House"

The Question of the House Itself

Before tracing ownership, war, or industry, one critical question must be addressed plainly:

Who built the house now known as The Belvedere, and when?

At present, the answer remains unproven.

While the property is often associated with an estimated date of circa 1790, it is important to distinguish between ownership and construction. Available records suggest the land was held and conveyed around 1790, but no surviving deed, construction record, or contemporary description has yet been identified that definitively states when the house itself was constructed or who built it.

What is documented is the Colston family's early presence on the land and their role in establishing milling operations along the Potomac. The house may have been constructed by:

  • George Chapman or Eli Phelps (each land owners prior to the Colston family ownership in the late 18th century), as part of early settlement along the Potomac, with the possibility that an initial structure existed prior to Colston ownership and was later expanded or refined.
  • Rawleigh Colston, following his acquisition of the land in the 1790s, either constructing a residence himself or adapting an existing structure as part of the Honeywood complex.
  • Edward Colston, during the early nineteenth‑century expansion of milling operations, likely improving, enlarging, or formalizing an existing river dwelling into a more substantial residence closely tied to the mill enterprise.

Until further documentary or architectural evidence emerges, the precise origin of the house must remain an open question.

This uncertainty is not unusual for properties of this age and, rather than diminishing the site’s importance, underscores the need for continued research.

The Colston Family and the Mill

The Colstons at Dam No. 5

Among the families most closely tied to this land were the Colstons.

Rawleigh Colston, a Virginia landowner of the late eighteenth century, established the family seat at Honeywood, building a substantial brick house on a hill overlooking the Potomac River. The bricks used in its construction were imported from England and brought upriver by flatboat — a detail later recorded by his grandson, William B. Colston.

Rawleigh Colston married Elizabeth Marshall, sister of Chief Justice John Marshall, connecting the family to one of Virginia’s most prominent legal lineages.

Their son, Edward Colston, received approximately 418 acres by deed along the Potomac River, including the land adjoining Dam No. 5 and the associated milling works. Edward married Sarah Jane Brockenbrough, daughter of Judge William Brockenbrough of the Virginia Court of Appeals.

By the mid-nineteenth century, the Colston property included:

  • flouring mills at the river’s edge,
  • two principal dwellings associated with the mills,
  • agricultural land extending inland from the Potomac.

War Comes to the Potomac

The Strategic Importance of Dam No. 5

With Virginia’s secession in 1861, the Potomac River hardened into a military boundary — and Dam No. 5 became a deliberate objective.

The Chesapeake & Ohio Canal supplied Washington, D.C., with coal from Cumberland, Maryland. Disabling the canal meant threatening the capital’s industrial power, transportation, and winter fuel supply. This reality drew the attention of Confederate commanders early in the war.

Between June 1861 and January 1862, Confederate forces mounted multiple, coordinated attempts to damage Dam No. 5. These were not symbolic raids. Under the direction of General Thomas J. “Stonewall” Jackson, the efforts became sustained engineering operations carried out under fire, often at night and in freezing winter conditions.

In December 1861, these efforts culminated in two direct assaults on the dam. The first, conducted in early December under Paxton, tested Union defenses along the canal bank and confirmed the difficulty of dismantling the structure under fire. A second, more determined attempt followed later in the month under Colonel William B. Colston, again involving men working in the river while exposed to sustained musket and artillery fire from the Maryland side. Though neither assault succeeded in permanently destroying the dam, the fighting resulted in an estimated nineteen fatalities, with approximately ten Confederate soldiers and nine Union soldiers killed during the two engagements.

Union troops occupied the Maryland side of the river, converting the drained canal bed itself into a fortified rifle trench. Confederate soldiers worked from the Virginia shore, exposed to artillery and long-range musket fire, attempting to dismantle the dam’s wooden cribs and abutments by hand.

Jackson returned repeatedly to the site, adjusting tactics, employing diversions at Falling Waters and Williamsport, and committing men to exhausting labor in the river. The contest at Dam No. 5 was not a single battle but weeks of endurance, deception, and persistence, fought as much with crowbars and axes as with rifles.

The river, the dam, and the land beneath the house became an active front in Stonewall Jackson’s Shenandoah Valley campaign.

Thomas “Stonewall” Jackson
Thomas “Stonewall” Jackson

“If this plan succeeds, Washington will hardly get any further supply of coal during the war from Cumberland.”
— General Thomas J. “Stonewall” Jackson, correspondence, December 1861

William B. Colston at the Dam

“The Dam Was Situated on Our Own Land”

What distinguishes this property from most Civil War sites is not simply proximity to fighting, but first‑person testimony from a resident who participated in the action.

In his memoir, The Personal Experiences of Capt. W. B. Colston in the Civil War, William B. Colston wrote:

“This dam was situated on our own land, and we were thoroughly familiar with every part of it and the surrounding country.”

William B. Colston, born at Honeywood on April 25, 1836, son of Edward Colston and grandson of Rawleigh Colston, enlisted as a private in the company commanded by his older brother, Captain Raleigh T. Colston, of the 2nd Virginia Regiment. Because of their intimate knowledge of the site, Raleigh was placed in charge of a demolition detail tasked with damaging the dam.

The work was conducted primarily at night.

“On one occasion, a few days before Christmas, I spent the entire night in the river, the water reaching to my waist, endeavoring to break out one of the wooden abutments of the dam.” — Capt. W. B. Colston

Colston described intense cold, exhaustion, and repeated enemy fire. Though the damage inflicted by hand labor proved insufficient, later winter floods weakened the structure further.

“The amount of fatigue which the men endured, laboring, as they constantly did, waist-deep in water, and in the intense cold of winter, can never be sufficiently appreciated.” — Major Robert Dabney

“The men lacked even the luxury of a campfire on the shore to warm themselves by, as no blazes were permitted so close to the enemy. The abstentious (Stonewall) Jackson, however, was more generous than usual with the whiskey stores that night.” — Author Jason Barrett, “Stonewall Assaults Dam No. 5”

The House During the Fighting

Evacuation, Occupation, Survival

As Confederate operations intensified along the Potomac, civilian life on the Colston property became untenable.

William B. Colston recorded that his mother and sisters were forced to evacuate, seeking refuge farther south with relatives. Confederate troops camped on familiar Colston land, including Medway, another family-associated property nearby.

Contemporary newspapers reported cannon fire, casualties, and abandoned tools — axes, picks, crowbars — left behind after forced withdrawals. Union cavalry crossed the dam and scoured the Virginia countryside.

Through all of this, the principal structures associated with the mill endured.

The campaign on the Potomac - LO-RES

After the War

Return and Continuity

When the war ended, William B. Colston returned to the property:

“I resumed my residence upon the old place…”

The mills, houses, and land were not abandoned relics, but working places restored after hardship. Although fortunes were diminished and structures damaged, life along the river resumed.

Over time, the canal closed, milling ceased, and ownership changed. Names evolved. The house endured.

The Canal Declines, Power Rises

From Commerce to Electricity

By the late nineteenth century, the era that had given birth to Dam No. 5 was coming to a close.

Railroads steadily eclipsed canals as the dominant mode of transportation, and the Chesapeake & Ohio Canal—long plagued by floods, costly repairs, and wartime damage—entered a slow decline. Although portions of the canal remained operational into the early twentieth century, its role as a primary commercial artery faded.

Dam No. 5, however, did not lose its relevance.

Instead of feeding canal boats, the dam was repurposed to harness hydroelectric power. By the early 1900s, private power interests recognized that the same controlled drop in the Potomac River that once served commerce could now serve electricity generation. Infrastructure was added, modified, and reinforced. The river, once again, dictated the future.

The transition marked a new industrial chapter: from flour and transport to turbines and current.

genorator2

The Power Company Era

Modernization of an Old River

As power companies acquired rights to the dam and surrounding infrastructure, Dam No. 5 underwent further modernization. Stonework replaced earlier timber elements. Mechanical systems were updated. Control over the river became more precise, less seasonal, and less dependent on human labor.

This period brought stability to the river but also separation: the dam was no longer a community hub of millers, boatmen, and farmers. It became a managed industrial asset.

Yet the historic structures nearby—including the former Colston dwellings—remained.

While the river was engineered for modern needs, the houses along its banks continued to evolve more quietly, shaped not by industry but by ownership.

Doc Img

The House Passes Through Time

Layers of Ownership, Layers of Character

After the Colston era, the house that would one day be known as The Belvedere passed through a series of owners. Each brought a different relationship to the property:

  • Some viewed it as a working riverside residence
  • Others as a retreat from town life
  • Still others as a historic structure worthy of preservation

Rather than erasing the past, successive owners added layers of character—alterations, restorations, gardens, porches, and interior refinements that reflected the tastes and values of their time.

What makes the house remarkable is not architectural purity, but continuity. It was never abandoned. Never erased. Never rebuilt beyond recognition.

The river remained constant. The house adapted.

The Belvedere Today

A Living Historical Landscape

The name “The Belvedere” is modern. The history is not.

Today, the property stands as the cumulative result of centuries:

  • Indigenous river use
  • Early American milling
  • Canal-era commerce
  • Civil War conflict under Stonewall Jackson
  • Industrial power generation
  • Private stewardship and restoration

Few properties can claim such a continuous relationship with both water and human activity.

The Potomac still flows past the dam. The house still watches from above.

MC Masters

Voices of the River

History at the Belvedere is not silent. It survives through words left behind by those who lived, labored, and fought here.

“This dam was situated on our own land, and we were thoroughly familiar with every part of it and the surrounding country.”
William B. Colston, Civil War memoir

“If this plan succeeds, Washington will hardly get any further supply of coal during the war from Cumberland.”
General Thomas J. “Stonewall” Jackson, December 1861

“The enemy turned the water out of the canal and used it as a rifle pit, and succeeded in driving our men away.”
— Union account, December 1861

Together, these voices describe the same place from opposing banks of the river—one land, one dam, one contested flow of water.

The Belvedere in the Present Day

Wedding

A Place for Gathering

What once drew millers, laborers, soldiers, and engineers now draws people for a different purpose.

Today, the Belvedere serves as a place of gathering and connection, welcoming guests from across the country for:

  • weddings and celebrations,
  • small private events and mixers,
  • retreats centered on water, landscape, and history.

The river that once powered mills and shaped military strategy now frames moments of joy, reflection, and human connection. Boats pass where canal traffic once moved. Laughter replaces cannon fire. The setting remains constant, even as its use evolves.

This continuity is not accidental. It reflects a long tradition of stewardship—honoring the past while allowing the property to remain alive.

The Belvedere endures not as a relic, but as a place still fulfilling its oldest purpose: bringing people together at the water’s edge.

Timeline of The Belvedere & Dam No. 5

1700s — Crown Grants, Early Settlement, and the Colston Arrival

  • Colonial era: The land lay within the proprietary holdings of Lord Thomas Fairfax under British crown grant, establishing the legal framework through which land here was surveyed, patented, and conveyed.
  • June 15, 1770: Lord Fairfax sold 318 acres to Tunis Wells.
  • 1773: Tunis Wells sold 218 acres of the Honeywood tract to George Chapman.
  • 1793: George Chapman sold the property to Eli Phelps.
  • Circa 1795: Eli Phelps sold the land to Rawleigh Colston, establishing long‑term Colston family ownership along this stretch of the Potomac River.

Honeywood was constructed nearby, and milling activity developed along the river. The precise construction date of the nearby river dwellings—including the house now known as The Belvedere—remains unproven.

1830s

  • 1833–1834: Construction of Dam No. 5 by the Chesapeake & Ohio Canal Company. The dam diverts Potomac River water into the canal, formalizing the site’s regional importance and increasing the strategic value of the surrounding mills and residences.

1850s

  • 1851–1852: Death of Edward Colston; Colston family stewardship of the river property continues.
  • 1857: Severe flooding damages the original timber crib dam. Temporary repairs are made. Stone for reconstruction is purchased locally, including from Sarah Jane Colston, tying the family directly to the dam’s physical rebuilding.

Civil War Era — Stonewall Jackson at the Potomac (1861–1862)

  • June 1861: Confederate forces attempt to damage Dam No. 5 prior to the evacuation of Harpers Ferry.
  • December 1861: General Thomas J. “Stonewall” Jackson targets Dam No. 5 as part of his Shenandoah Valley operations, recognizing its importance to Union coal supply and canal transport.
  • December 1861 – January 1862: Under Stonewall Jackson’s personal direction, Confederate troops conduct repeated night operations to disable the dam. Captain Raleigh T. Colston (2nd Virginia) and William B. Colston participate directly in demolition efforts, working from land they knew intimately.
  • Winter 1862: Flooding further damages the weakened dam after Jackson’s withdrawal, temporarily affecting canal navigation.

Post–Civil War

  • Post-1865: William B. Colston returns to reside on the property, resuming civilian life along the Potomac River.
  • 1871: A newspaper advertisement offers the Colston river property, mills, and associated dwellings for sale, reflecting mounting financial strain on the family following the Civil War. The sale was conducted under the authority of the Berkeley County Circuit Court, signaling formal legal proceedings over the estate. The notice states that prospective buyers could view the property by contacting William B. Colston or James Dunn, both of whom were residing on the premises at the time—indicating continued occupation of the principal houses, likely including the dwelling now known as The Belvedere.
  • 1871 (Auction Result): William T. West, Jr. emerges as the purchaser of the mill site and associated river properties following court‑ordered sale. Available records indicate that West acquired not only the mills but control of the surrounding mill houses and working river frontage, marking the transition of the property from long‑standing family ownership to a new phase of private industrial stewardship.

Late 19th Century

  • Late 1800s: Commercial canal traffic declines as railroads become dominant. Milling activity along the river diminishes.
  • 1887: Newspaper reports announce that the Susquehanna Paper Company begins construction of a wood-pulp mill at the site of the former Honeywood Mill at Dam No. 5. The project is supervised by J. West, serving as superintendent.
  • Late 1880s: The pulp mill is powered by the overflow of Dam No. 5, utilizing three large turbine wheels. The facility produces up to 100 tons of wood pulp per week, ships material from Williamsport to paper mills in Pennsylvania, and employs approximately 50 workers—signaling a decisive shift from family milling to corporate industrial production.

Early 20th Century

  • 1904: The Martinsburg Power Company installs hydroelectric generating equipment at Dam No. 5, adapting the former canal and milling infrastructure for electricity production. The nearby Honeywood Mill settlement, originally built as a flour mill in the 1830s and later converted to a pulp grinding mill in the 1880s, becomes part of this new industrial phase.
Original building of Martins-berg

This conversion marks a pivotal transition in the site’s history—from water‑driven commerce and milling to modern power generation—extending the dam’s usefulness well beyond the canal era.

Mid–Late 20th Century

  • Mid‑1900s: Ownership and operation of Dam No. 5 consolidates under regional electric utilities. Potomac Light and Power Company acquires the dam and related facilities from a predecessor utility operating in the Berkeley County region, continuing hydroelectric generation while modernizing control systems and infrastructure.
Headrace

Mid–Late 20th Century

  • 1936: Closure of the Chesapeake & Ohio Canal as a commercial waterway.
  • Mid-1900s: Continued modernization of the dam for power management; nearby historic residences remain in private use.
Dam

Modern Era

  • Late 20th–Early 21st Century: The house passes through successive private owners, each contributing architectural refinements and landscape improvements.
  • Present Day: The property is preserved as The Belvedere, a historic river estate shaped by centuries of use, conflict, industry, and stewardship.
Present Day

Architecture: Evolution Without a Fixed Date

A House Shaped by Use

The house now known as The Belvedere does not announce its origins with a single construction date or named builder. Instead, it reflects a process of evolution, common to early American river properties.

Key characteristics suggest phased development:

  • Substantial masonry construction suitable for a prominent river estate
  • Orientation toward the Potomac, emphasizing oversight of river and mill activity
  • Later refinements consistent with 19th-century domestic comfort rather than initial frontier construction

It remains unclear whether the structure began as:

  • a primary Colston residence,
  • a mill manager’s dwelling,
  • or an earlier core later expanded.

What is clear is continuity: the house adapted across eras without being erased.

Human Stories at the River’s Edge

Family, Labor, and War under Stonewall Jackson

The Civil War reached the banks of the Potomac here not as an abstract campaign, but as a sustained, physical ordeal directed by one of the Confederacy’s most consequential commanders: General Thomas J. “Stonewall” Jackson.

Between December 1861 and January 1862, Stonewall Jackson personally planned and oversaw multiple attempts to disable Dam No. 5, recognizing that its destruction could cripple the Chesapeake & Ohio Canal and disrupt coal supplies to Washington, D.C. These operations were not symbolic raids; they were methodical engineering efforts conducted under fire, in winter conditions, and often at night.

For the Colston family, Jackson’s campaign was not fought on distant ground. It unfolded on their own land.

William B. Colston’s diary and memoir provide rare first-person testimony of Jackson’s campaign from the perspective of a resident-soldier. Colston described working waist-deep in the Potomac River, attempting to dismantle the dam’s wooden abutments while Union fire swept the river from the Maryland shore. His older brother, Captain Raleigh T. Colston, was selected to lead demolition details precisely because of his intimate knowledge of the dam and surrounding terrain—knowledge gained through a lifetime living beside it.

Stonewall Jackson returned repeatedly to the site, adjusting tactics, employing diversions at Falling Waters and Williamsport, and committing men to exhausting labor that tested the limits of endurance. Civilians evacuated. Confederate troops camped on familiar lawns. Family property became operational ground in Jackson’s Shenandoah Valley campaign.

After Jackson’s withdrawal, and after the war itself had passed, life resumed along the river—not unchanged, but continuous. The house endured, bearing silent witness to a moment when one of the Civil War’s defining figures brought the conflict directly to its doorstep.

Stewardship Across Generations

Preservation Through Care

From the Colstons forward, stewardship of the property has been defined less by ownership and more by continuity.

Each generation adapted the house to its needs while preserving its essential character. Industrial use gave way to residential care; utility yielded to preservation.

The modern stewards of The Belvedere continue this tradition—maintaining a place shaped by water, work, conflict, and time.

The river flows. The house endures. The story continues.

31

Sources

  1. “The Skirmish at Dam No. 5.” Hagerstown Herald of Freedom and Torch Light (Hagerstown, Maryland), December 18, 1861.
    • Contemporary newspaper account describing the December 1861 fighting at Dam No. 5, including reported casualties, artillery fire, abandoned tools, and assessments of damage to the dam.
  2. “Unsuccessful Attempt of the Confederate Troops to Destroy Dam No. 5, Near Williamsport, MD.” Wood engraving from Frank Leslie’s Illustrated Newspaper, sketch by Captain Henry Bacon, published 1862.
  3. Colston, William B. The Personal Experiences of Capt. W. B. Colston in the Civil War.
    • First‑person memoir describing Confederate operations at Dam No. 5, including night demolition work conducted on Colston family land.
  4. Marshall, Thomas C. Letter dated December 9, 1861, Martinsburg, Virginia.
    • Describes the December 7–8, 1861 Confederate raid on Dam No. 5; written by a volunteer aide associated with Stonewall Jackson’s command.
  5. Barrett, Jason. “Stonewall Assaults Dam No. 5.” America’s Civil War, September 2000.
    • Scholarly secondary analysis of Stonewall Jackson’s operations against the Chesapeake & Ohio Canal at Dam No. 5.
  6. Wood, Don C. Article on Dam No. 5 and the Colston family.
    • Discusses William B. Colston’s participation in dam demolition efforts and the Colston family’s relationship to the Honeywood mill property.
  7. Chesapeake & Ohio Canal Company. Construction Chronology: Section No. 202 (Dam No. 5).
    • Contract records documenting construction dates, contractors (Byrnes & Co.), and costs of Dam No. 5 (1832–1834).
  8. Unrau, Harlan D. Historic Resource Study: Chesapeake & Ohio Canal. National Park Service.
    • Provides technical and historical background on canal construction, slackwater dams, and guard locks.
  9. Berkeley County Circuit Court (West Virginia). Estate proceedings of Edward Colston, c. 1870s–1880s.
    • Includes depositions, chancery cases, and rulings related to the sale of the Honeywood mill property and associated water rights.
  10. Newspaper Advertisement (1871). Sale of Colston river property, mills, and dwellings.
    • Public notice offering the mill site and residences for sale; states that prospective buyers could be shown the property by William B. Colston or James Dunn.
  11. Library of Congress, Prints & Photographs Division. Dam No. 5 imagery and engravings.
    • Archival visual materials documenting the dam, canal structures, and Civil War activity.
  12. WHILBR (West Virginia History On‑Line Resource). “Skirmish at Dam 5 — 1861.”
    • Digital compilation of primary and secondary materials relating to Civil War engagements at Dam No. 5.
  13. Wilderness Voyageurs. “C&O Canal Dam No. 5 and Stonewall Jackson.”
    • Interpretive narrative describing the December 1861 Confederate operations at the dam.
  14. C&O Canal National Historical Park. Dam No. 5 and Guard Lock No. 5 interpretive materials.
    • National Park Service historical summaries and site interpretation.
  15. Hagerstown Herald of Freedom and Torch Light. Additional Civil War‑era reporting, 1861–1862.
    • Regional newspaper coverage of canal defense, military movements, and Potomac River engagements.
  16. 13th Massachusetts Volunteer Infantry. “Service of the Thirteenth Massachusetts Volunteers in 1861.”
    • Official regimental history website documenting the early Civil War service of the 13th Massachusetts Infantry, including duty along the Potomac River and defensive actions associated with Dam No. 5.
    • URL: https://13thmass.org/1861/index.html
GET STARTED

Ready to Make Memories at The Belvedere?

CONTACT US

Monday - Friday, 9:30 am – 5:30 pm

Email: belvedere@dem360.com
Phone: 301-988-8383

3632 Vineyard Rd.
Falling Waters, WV 25419 

OUR STORY

The home was built (around 1790) to take advantage of the view. A historic site of both Revolutionary and Civil War events involving battles for the Potomac Ford, a dam, and old mill. It is a peaceful, private, and incredibly beautiful location.

© 2026 Belvedere on the Potomac
Website by RobiDigital